This paper addresses the scheduling of uniformdependence loop nests within the framework of the bulksynchronous parallel (BSP) model. Two broad classes of tightly-nested loops are identifiedinthe paper and scheduled according to the BSP discipline, and the resulting schedules are analysed in terms of the BSP cost model.