Sciweavers

JCIT
2010

Dynamic Integrated Algorithm for Production Scheduling Based on Iterative Search

13 years 7 months ago
Dynamic Integrated Algorithm for Production Scheduling Based on Iterative Search
It is quite difficult to adapt to the changing production scheduling problem for an algorithm of a certain question. According to this, a strategy of dynamic integrated iterative search algorithm is proposed. Firstly, the relationship model of production problem and algorithm is built. Secondly, the framework of the iterative search algorithm is proposed. On the basis of these, the strategy of dynamic integrated iterative search algorithm based on multi agent is put forward, which can easily adapt to the changeable workshop production environment. The experimental results show the effectiveness and adaptability of the system.
Cunli Song, Xiaobing Liu, Wei Wang, Ming Huang
Added 19 May 2011
Updated 19 May 2011
Type Journal
Year 2010
Where JCIT
Authors Cunli Song, Xiaobing Liu, Wei Wang, Ming Huang
Comments (0)