Estimating the productivity of cyclic construction operations using case-based reasoning

13 years 11 months ago
Estimating the productivity of cyclic construction operations using case-based reasoning
The estimation of productivity rates in cyclic construction processes is a difficult, but essential task in the planning of construction projects. The conventional method--a calculation by intuition--for devising such estimates is often laborious and inaccurate. To overcome these difficulties this paper proposes that Case-Based Reasoning could be employed to provide estimates from historical cases of construction. To this end a model, Case-Based Estimator (CBE) is presented. CBE is a small model, consisting of five input features, one output and a small case base, and it is suggested that the findings within this paper could be applied to any small model of similar characteristics--not only within the construction field. The development and implementation of the model is discussed and an experiment was performed to assess the ability of two retrieval mechanisms (one a simple mathematical formula, the other an adaptation of the ID3 decision tree generating algorithm) to measure similar...
Darren Graham, Simon D. Smith
Added 16 Dec 2010
Updated 16 Dec 2010
Type Journal
Year 2004
Where AEI
Authors Darren Graham, Simon D. Smith
Comments (0)