Sciweavers

GECCO
2007
Springer

A hybrid GA for a supply chain production planning problem

14 years 5 months ago
A hybrid GA for a supply chain production planning problem
The problem of production and delivery lot-sizing and scheduling of set of items in a two-echelon supply chain over a finite planning horizon is addressed in this paper. A single supplier produces several items on a flexible flow line (FFL) production system and delivers them directly to an assembly facility. Based on the wellknown basic period (BP) policy, a new mixed zero-one nonlinear programming model has been developed to minimize average setup, inventory-holding and delivery costs per unit time in the supply chain without any stock-out. The problem is very complex and it could not be solved to optimality especially in real-sized problems. So, an efficient hybrid genetic algorithm (HGA) using the most applied BP approach (i.e. power-of-two policy) has been proposed. The solution quality of the proposed algorithm called PT-HGA has been evaluated and compared with the common cycle approach in some problem instances. Numerical experiments demonstrate the merit of the PT-HGA and indi...
Masoud Jenabi, S. Ali Torabi, S. Afshin Mansouri
Added 07 Jun 2010
Updated 07 Jun 2010
Type Conference
Year 2007
Where GECCO
Authors Masoud Jenabi, S. Ali Torabi, S. Afshin Mansouri
Comments (0)