Lot-sizing with production and delivery time windows

14 years 7 days ago
Lot-sizing with production and delivery time windows
We study two different lot-sizing problems with time windows that have been proposed recently. For the case of production time windows, in which each client specific order must be produced within a given time interval, we derive tight extended formulations for both the constant capacity and uncapacitated problems with Wagner-Whitin (non-speculative) costs. For the variant with nonspecific orders, known to be equivalent to the problem in which the time windows can be ordered by time, we also show equivalence to the basic lot-sizing problem with upper bounds on the stocks. Here we derive polynomial time dynamic programming algorithms and tight extended formulations for the uncapacitated and constant capacity problems with general costs. For the problem with delivery time windows, we use a similar approach to derive tight extended formulations for both the constant capacity and uncapacitated problems with WagnerWhitin (non-speculative) costs. Key words. : production time windows, lot-sizi...
Laurence A. Wolsey
Added 14 Dec 2010
Updated 14 Dec 2010
Type Journal
Year 2006
Where MP
Authors Laurence A. Wolsey
Comments (0)