In this paper we describe a method to reuse models with Model-Based Subgroup Discovery (MBSD), which is a extension of the Subgroup Discovery scheme. The task is to predict the number of bikes at a new rental station 3 hours in advance. Instead of training new models with the limited data from these new stations, our approach first selects a number of pre-trained models from old rental stations according to their mean absolute errors (MAE). For each selected model, we further performed MBSD to locate a number of subgroups that the selected model has a deviated prediction performance. Then another set of pre-trained models are selected only according to their MAE over the subgroup. Finally, the prediction are made by averaging the prediction from the models selected during the previous two steps. The experiments show that our method performances better than selecting trained models with the lowest MAE, and the averaged lowMAE models.