A Multi-Heuristic GA for Schedule Repair in Precast Plant Production

14 years 25 days ago
A Multi-Heuristic GA for Schedule Repair in Precast Plant Production
A multi-heuristic schedule repair model for schedule conflict resolution is presented and its application in repairing the schedules of a prefabrication plant is described in this paper. The model combines heuristic strategies with Genetic Algorithms to repair schedules with resource constraints. The GA determines the “best” sequence of resolving schedule disturbances using heuristic rules selected from a library of heuristics commonly used in industry. We compare quantitatively the advantages of using this model for schedule repair against existing singleheuristic schedule repair techniques with a multi-criteria evaluation function. Results on the macroscopic and microscopic levels are presented to understand the strengths and weaknesses of the model. Key words: application of planning and scheduling; dynamic scheduling.
Weng Tat Chan, Tan Heng Wee
Added 31 Oct 2010
Updated 31 Oct 2010
Type Conference
Year 2003
Where AIPS
Authors Weng Tat Chan, Tan Heng Wee
Comments (0)