Sciweavers

TASE
2011
IEEE

Multiresource Shop Scheduling With Resource Flexibility and Blocking

13 years 4 months ago
Multiresource Shop Scheduling With Resource Flexibility and Blocking
—This paper proposes a general scheduling model that extends job-shop scheduling models to incorporate important features of real manufacturing systems. More precisely, each operation can be performed in different modes and requires a different set of resources depending on the mode. Further, we consider blocking constraints that requires to hold resources used for an operation till resources needed for the next operation of the same job are available. A shortest path approach extending the classical geometric approach is proposed for the two-job case. A greedy heuristic is then proposed to schedule jobs by considering jobs sequentially, grouping scheduled jobs into a combined job and then scheduling it and the next unscheduled job using the shortest path approach. A metaheuristic is then used to identify effective job sequences. Extensive numerical experimentation proves the efficiency of our approach. Note to Practitioners—Many manufacturing systems such as the production of key...
Yazid Mati, Xiaolan Xie
Added 22 Aug 2011
Updated 22 Aug 2011
Type Journal
Year 2011
Where TASE
Authors Yazid Mati, Xiaolan Xie
Comments (0)