Sciweavers

205 search results - page 14 / 41
» A Heuristic Solution for a Driver-Vehicle Scheduling Problem
Sort
View
AUSAI
2003
Springer
14 years 28 days ago
Guided Operators for a Hyper-Heuristic Genetic Algorithm
We have recently introduced a hyper-heuristic genetic algorithm (hyper-GA) with an adaptive length chromosome which aims to evolve an ordering of low-level heuristics so as to find...
Limin Han, Graham Kendall
COR
2011
13 years 2 months ago
A Lagrangian heuristic for satellite range scheduling with resource constraints
The task of scheduling communications between satellites and ground control stations is getting more and more critical since an increasing number of satellites must be controlled ...
Fabrizio Marinelli, Salvatore Nocella, Fabrizio Ro...
TEC
2002
152views more  TEC 2002»
13 years 7 months ago
Ant colony optimization for resource-constrained project scheduling
An ant colony optimization (ACO) approach for the resource-constrained project scheduling problem (RCPSP) is presented. Several new features that are interesting for ACO in general...
Daniel Merkle, Martin Middendorf, Hartmut Schmeck
EOR
2006
80views more  EOR 2006»
13 years 7 months ago
Vehicle routing and crew scheduling for metropolitan mail distribution at Australia Post
This paper presents a new multi-depot combined vehicle and crew scheduling algorithm, and uses it, in conjunction with a heuristic vehicle routing algorithm, to solve the intra-ci...
B. L. Hollis, M. A. Forbes, B. E. Douglas
ICC
2007
IEEE
138views Communications» more  ICC 2007»
14 years 2 months ago
Optimal Observation Scheduling for connected target coverage problem in Wireless Sensor Networks
— In this paper, we consider the problem of scheduling sensor activity to maximize network lifetime while maintaining both discrete targets coverage and network connectivity. We ...
Qun Zhao, Mohan Gurusamy