A number of industrial applications advocate the use of time-triggered approaches for reasons of predictability, distribution, and particular constraints such as jitter or end-to-...
— Multi-slot resource scheduling in a general two dimensional wireless ad hoc network, is a hard problem with no known polynomial-time solution. Recent optimization theoretic ana...
This paper presents the incorporation of an auto-tuning real-time garbage collector into a feedback-based on-line scheduling system. The studied feedback scheduler is designed to ...
Sven Gestegard Robertz, Dan Henriksson, Anton Cerv...
We introduce the multiple capacitated job shop scheduling problem as a generalization of the job shop scheduling problem. In this problem machines may process several operations s...
This paper presents a dynamic programming (DP) algorithm for solving a labor scheduling problem with several realistic days-off scheduling constraints and a cost structure that dep...