Abstract—We study the joint power control and minimumframe-length scheduling problem in wireless networks, under the physical interference model and subject to consecutive transm...
We consider graph coloring problems where the cost of a coloring is the sum of the costs of the colors, and the cost of a color is a monotone concave function of the total weight ...
Submodular maximization generalizes many important problems including Max Cut in directed/undirected graphs and hypergraphs, certain constraint satisfaction problems and maximum f...
This paper presents a heuristic algorithm for solving RCPSP/max, the resource constrained project scheduling problem with generalized precedence relations. The algorithm relies, a...
While most prior work on multiprocessor real-time scheduling focuses on independent tasks, dependencies due to non-preemptive sections, suspensions, and pipelinebased precedence c...