In high energy physics, bioinformatics, and other disciplines, we encounter applications involving numerous, loosely coupled jobs that both access and generate large data sets. So...
We consider the problem of minimizing average flow time on multiple machines when each job can be assigned only to a specified subset of the machines. This is a special case of sc...
In this paper, we re-analyse the Rate Monotonic Scheduler. Traditionally, the schedulability condition was obtained from the greatest lower bound of utilisation factors over all t...
This paper addresses the problem of estimating lower bounds on the power consumption in scheduled data flow graphs with a fixed number of allocated resources prior to binding. T...
Lars Kruse, Eike Schmidt, Gerd Jochens, Ansgar Sta...
: New semiconductor wafer fabrication facilities use Front Opening Unified Pods (FOUPs) as a common unit of wafer transfer. Since the number of pods is limited due to high costs, a...