Sciweavers

80 search results - page 4 / 16
» A tight lower bound for job scheduling with cancellation
Sort
View
HPDC
2002
IEEE
14 years 10 days ago
Decoupling Computation and Data Scheduling in Distributed Data-Intensive Applications
In high energy physics, bioinformatics, and other disciplines, we encounter applications involving numerous, loosely coupled jobs that both access and generate large data sets. So...
Kavitha Ranganathan, Ian T. Foster
FOCS
2007
IEEE
13 years 11 months ago
Minimizing Average Flow-time : Upper and Lower Bounds
We consider the problem of minimizing average flow time on multiple machines when each job can be assigned only to a specified subset of the machines. This is a special case of sc...
Naveen Garg, Amit Kumar
IPL
2010
80views more  IPL 2010»
13 years 5 months ago
Rate monotonic scheduling re-analysed
In this paper, we re-analyse the Rate Monotonic Scheduler. Traditionally, the schedulability condition was obtained from the greatest lower bound of utilisation factors over all t...
Qiwen Xu, Naijun Zhan
ISSS
2000
IEEE
127views Hardware» more  ISSS 2000»
13 years 11 months ago
Lower Bound Estimation for Low Power High-Level Synthesis
This paper addresses the problem of estimating lower bounds on the power consumption in scheduled data flow graphs with a fixed number of allocated resources prior to binding. T...
Lars Kruse, Eike Schmidt, Gerd Jochens, Ansgar Sta...
EOR
2007
82views more  EOR 2007»
13 years 7 months ago
Minimizing makespan with multiple-orders-per-job in a two-machine flowshop
: New semiconductor wafer fabrication facilities use Front Opening Unified Pods (FOUPs) as a common unit of wafer transfer. Since the number of pods is limited due to high costs, a...
Jeffrey D. Laub, John W. Fowler, Ahmet B. Keha