Sciweavers

638 search results - page 51 / 128
» Activity-Based Scheduling of IT Changes
Sort
View
JAIR
2006
74views more  JAIR 2006»
13 years 7 months ago
Understanding Algorithm Performance on an Oversubscribed Scheduling Application
The best performing algorithms for a particular oversubscribed scheduling application, Air Force Satellite Control Network (AFSCN) scheduling, appear to have little in common. Yet...
Laura Barbulescu, Adele E. Howe, L. Darrell Whitle...
AIR
2005
114views more  AIR 2005»
13 years 7 months ago
Airport Gate Scheduling with Time Windows
In contrast to the existing airport gate assignment studies where flight have fixed schedules, we consider the more realistic situation where flight arrival and departure times can...
Andrew Lim, Brian Rodrigues, Yi Zhu
TEC
2002
152views more  TEC 2002»
13 years 7 months ago
Ant colony optimization for resource-constrained project scheduling
An ant colony optimization (ACO) approach for the resource-constrained project scheduling problem (RCPSP) is presented. Several new features that are interesting for ACO in general...
Daniel Merkle, Martin Middendorf, Hartmut Schmeck
VC
2010
165views more  VC 2010»
13 years 6 months ago
Generating animation from natural language texts and semantic analysis for motion search and scheduling
This paper presents an animation system that generates an animation from natural language texts such as movie scripts or stories. It also proposes a framework for a motion database...
Masaki Oshita
TON
2010
126views more  TON 2010»
13 years 2 months ago
MAC Scheduling With Low Overheads by Learning Neighborhood Contention Patterns
Aggregate traffic loads and topology in multi-hop wireless networks may vary slowly, permitting MAC protocols to `learn' how to spatially coordinate and adapt contention patte...
Yung Yi, Gustavo de Veciana, Sanjay Shakkottai