Sciweavers

638 search results - page 52 / 128
» Activity-Based Scheduling of IT Changes
Sort
View
ICCAD
2006
IEEE
129views Hardware» more  ICCAD 2006»
14 years 4 months ago
Energy budgeting for battery-powered sensors with a known task schedule
Battery-powered wireless sensors are severely constrained by the amount of the available energy. A method for computing the energy budget per sensing task can be a valuable design...
Daler N. Rakhmatov
IPPS
2008
IEEE
14 years 2 months ago
A dynamic scheduling approach for coordinated wide-area data transfers using GridFTP
Many scientific applications need to stage large volumes of files from one set of machines to another set of machines in a wide-area network. Efficient execution of such data t...
Gaurav Khanna 0002, Ümit V. Çataly&uum...
GLOBECOM
2007
IEEE
14 years 2 months ago
Design of High Throughput Scheduled Mesh Networks: A Case for Directional Antennas
Abstract— Scheduled wireless mesh networks (WMNs) represent an important paradigm in the development of high speed wireless access networks. As a consequence of [1], it can be sh...
Skanda N. Muthaiah, Aravind Iyer, Aditya Karnik, C...
INFOCOM
2006
IEEE
14 years 1 months ago
A Joint Design of Distributed QoS Scheduling and Power Control for Wireless Networks
— The capacity of a power controlled wireless network can be changing due to user’s mobility, fading or shadowing effects. As a result, the quality of service (QOS) of users ac...
Chun-Chia Chen, Duan-Shin Lee
IPPS
2006
IEEE
14 years 1 months ago
Instability in parallel job scheduling simulation: the role of workload flurries
The performance of computer systems depends, among other things, on the workload. This motivates the use of real workloads (as recorded in activity logs) to drive simulations of n...
Dan Tsafrir, Dror G. Feitelson