In the recent years, CSP's have come to be seen as the core problem in many applications. We propose here a hybrid algorithm (MC-FC) that combines two different search method...
Delay management is an important issue in the daily operations of any railway company. The task is to update the planned timetable to a disposition timetable in such a way that the...
Abstract. This research develops an optimal planning model for pump-treatinject based groundwater remediation systems. Optimizing the design of the pump-treat-inject system is a no...
In this paper we address the problem of constrained optimization (ILP formulation) and propose a set of heuristic algorithms for assigning light-trails [1–4,7,10] to WDM ring ne...
There has been little attention to search based test data generation in the presence of pointer inputs and dynamic data structures, an area in which recent concolic methods have e...