Sciweavers

366 search results - page 16 / 74
» An Evolutionary Hybrid Scheduling Algorithm for Computationa...
Sort
View
HEURISTICS
2010
13 years 3 months ago
An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport
Operation management of underground passenger transport systems is associated with combinatorial optimization problems (known as crew and train scheduling and rostering) which bel...
Rafael Elizondo, Víctor Parada, Lorena Prad...
JCIT
2010
158views more  JCIT 2010»
13 years 3 months ago
A Flexible Grid Task Scheduling Algorithm Based on QoS Similarity
s In grid computing, the goals of task scheduling is to achieve high system optimization performance while matching multi-dimension Quiality of Service(QoS) requirement of applicat...
Kunfang Song, Shufen Ruan, Minghua Jiang
HPDC
2005
IEEE
14 years 2 months ago
Cost-based scheduling for data-intensive applications on global grids
We present an algorithm for scheduling distributed data intensive Bag-of-Task applications on Data Grids that have costs associated with requesting, transferring and processing da...
Srikumar Venugopal, Rajkumar Buyya
CCGRID
2008
IEEE
14 years 3 months ago
Joint Communication and Computation Task Scheduling in Grids
In this paper we present a multicost algorithm for the joint time scheduling of the communication and computation resources that will be used by a task. The proposed algorithm sel...
Kostas Christodoulopoulos, Nikolaos D. Doulamis, E...
IPPS
2009
IEEE
14 years 3 months ago
A parallel hybrid genetic algorithm-simulated annealing for solving Q3AP on computational grid
In this paper we propose a parallel hybrid genetic method for solving Quadratic 3-dimensional Assignment Problem (Q3AP). This problem is proved to be computationally NP-hard. The ...
Lakhdar Loukil, Malika Mehdi, Nouredine Melab, El-...