This paper is devoted to basic scheduling problems in which the scheduling cost of a job is not a function of its completion time. Instead, the cost is derived from the integratio...
Suppose we are given a set of objects that cover a region and a duration associated with each object. Viewing the objects as jobs, can we schedule their beginning times to maximiz...
Adam L. Buchsbaum, Alon Efrat, Shaili Jain, Suresh...
We consider the problem of scheduling n independent jobs on m identical machines that operate in parallel. Each job has a controllable processing time. The fact that the jobs have...
We study the problem of minimizing total latency in machine scheduling with deliveries, which is defined as follows. There is a set of n jobs to be processed by a single machine a...
Abstract. We address parallel jobs scheduling problem for computational GRID systems. We concentrate on two-level hierarchy scheduling: at the first level broker allocates computa...