Sciweavers

562 search results - page 16 / 113
» Approximation algorithms and hardness of the k-route cut pro...
Sort
View
CORR
2010
Springer
159views Education» more  CORR 2010»
13 years 5 months ago
On optimizing over lift-and-project closures
The lift-and-project closure is the relaxation obtained by computing all lift-and-project cuts from the initial formulation of a mixed integer linear program or equivalently by co...
Pierre Bonami
ISAAC
1992
Springer
132views Algorithms» more  ISAAC 1992»
14 years 1 days ago
Generalized Assignment Problems
In the multilevel generalized assignment problem (MGAP) agents can perform tasks at more than one efficiency level. Important manufacturing problems, such as lot sizing, can be ea...
Silvano Martello, Paolo Toth
CIAC
2006
Springer
106views Algorithms» more  CIAC 2006»
13 years 11 months ago
On the Hardness of Range Assignment Problems
We investigate the computational hardness of the Connectivity, the Strong Connectivity and the Broadcast type of Range Assignment Problems in R2 and R3. We present new reductions ...
Bernhard Fuchs
APPROX
2004
Springer
136views Algorithms» more  APPROX 2004»
14 years 1 months ago
On the Crossing Spanning Tree Problem
Given an undirected n-node graph and a set C of m cuts, the minimum crossing tree is a spanning tree which minimizes the maximum crossing of any cut in C, where the crossing of a c...
Vittorio Bilò, Vineet Goyal, R. Ravi, Mohit...
ICML
2010
IEEE
13 years 9 months ago
Restricted Boltzmann Machines are Hard to Approximately Evaluate or Simulate
Restricted Boltzmann Machines (RBMs) are a type of probability model over the Boolean cube {-1, 1}n that have recently received much attention. We establish the intractability of ...
Philip M. Long, Rocco A. Servedio