Real Options for Project Schedules (ROPS) has three recursive sampling/optimization shells. An outer Adaptive Simulated Annealing (ASA) optimization shell optimizes parameters of ...
The fitness landscape of the resource constrained project scheduling problem is investigated by examining the search space position type distribution and the correlation between t...
With the advent of system-on-a-chip design, many application specific integrated circuits (ASICs) now require multiple design clocks that operate asynchronously to each other. This...
We consider the problem of minimizing the total weighted completion time on identical parallel machines when jobs have stochastic processing times and may arrive over time. We give...
We consider a wireless network consisting of multiple transmitters with multicast traffic destined for a set of receivers. We are interested in the problem of joint scheduling and...