The guided tree edit distance problem is to find a minimum cost series of edit operations that transforms two input forests F and G into isomorphic forests F and G such that a thi...
Background: The Smith-Waterman algorithm for local sequence alignment is more sensitive than heuristic methods for database searching, but also more time-consuming. The fastest ap...
We propose a new algorithm, called Stripe-join, for performing a join given a join index. Stripe-join is inspired by an algorithm called \Jive-join" developed by Li and Ross....
: FASTER is a combinatorial optimization algorithm useful for finding low-energy side-chain configurations in side-chain placement and protein design calculations. We present two s...
Let E be an elliptic curve defined over F2n . The inverse operation of point doubling, called point halving, can be done up to three times as fast as doubling. Some authors have t...
Roberto Maria Avanzi, Mathieu Ciet, Francesco Sica