Sciweavers

565 search results - page 94 / 113
» Heuristics for Planning with SAT
Sort
View
KR
1989
Springer
13 years 12 months ago
Situated Control Rules
In this work we extend the work of Dean, Kaelbling, Kirman and Nicholson on planning under time constraints in stochastic domains to handle more complicated scheduling problems. I...
Mark Drummond
WSC
2008
13 years 10 months ago
A simulation based optimization algorithm for slack reduction and workforce scheduling
In an assembly line with high labor proportion, the workforce planning and scheduling is a very complex problem. At the background of increasing labor costs, it is very important ...
Daniel Noack, Oliver Rose
WSC
2008
13 years 10 months ago
A multi threaded and resolution approach to simulated futures evaluation
As part of the DARPA Deep Green efforts, SAIC developed a multi-threaded and resolution approach to constructing and evaluating simulated futures to address the SimPath component....
David R. Pratt, Robert W. Franceschini, Robert B. ...
CP
2008
Springer
13 years 9 months ago
Guiding Search in QCSP+ with Back-Propagation
The Quantified Constraint Satisfaction Problem (QCSP) has been introduced to express situations in which we are not able to control the value of some of the variables (the universa...
Guillaume Verger, Christian Bessiere
BCSHCI
2007
13 years 9 months ago
A pattern-based usability inspection method: first empirical performance measures and future issues
The Usability Pattern Inspection (UPI) is a new usability inspection method designed for the added downstream utility of producing concrete design recommendations. This paper prov...
Martin Schmettow, Sabine Niebuhr