Sciweavers

164 search results - page 3 / 33
» How to Model Operational Risk If You Must
Sort
View
BCSHCI
2008
14 years 9 days ago
Low cost prototyping: part 1, or how to produce better ideas faster by getting user reactions early and often
Although approaches to User Centered Software Development have existed for almost 20 years a rift still exists between theory and practice. In practice, many software projects are...
Stephen Brown, Andreas Holzinger
WSC
2004
14 years 6 days ago
Project Risk Simulation Under Uncertain Construction Duration
This paper establishes a two-phase model to explore the financial risk of construction project under uncertain construction duration. Treated as a random variable in the model, th...
Kun-jung Hsu
WSC
2001
14 years 6 days ago
How "overstaffing" at bottleneck machines can unleash extra capacity
Using simulation, Headway Technologies predicted that increasing staffing among a group of already lightly loaded machine operators--"overstaffing"--would significantly ...
Robert C. Kotcher
ARESEC
2011
145views more  ARESEC 2011»
12 years 10 months ago
An Attribute Based Framework for Risk-Adaptive Access Control Models
—The concept of risk-based adaptive access control (RAdAC, pronounced Raid-ack) has been recently introduced in the literature. It seeks to automatically (or semi-automatically) ...
Savith Kandala, Ravi S. Sandhu, Venkata Bhamidipat...
WSC
1997
14 years 5 days ago
AutoSched Tutorial
The AutoSchedTM finite capacity planning and scheduling tool helps you increase throughput, reduce in-process inventory, and increase equipment and personnel utilization. AutoSche...
Bill Lindler