Sciweavers

96 search results - page 12 / 20
» Improving Multi-agent Based Scheduling by Neurodynamic Progr...
Sort
View
EUROSYS
2006
ACM
14 years 4 months ago
On the road to recovery: restoring data after disasters
—Restoring data operations after a disaster is a daunting task: how should recovery be performed to minimize data loss and application downtime? Administrators are under consider...
Kimberly Keeton, Dirk Beyer 0002, Ernesto Brau, Ar...
CASES
2006
ACM
14 years 1 months ago
Integrated scratchpad memory optimization and task scheduling for MPSoC architectures
Multiprocessor system-on-chip (MPSoC) is an integrated circuit containing multiple instruction-set processors on a single chip that implements most of the functionality of a compl...
Vivy Suhendra, Chandrashekar Raghavan, Tulika Mitr...
LCTRTS
2005
Springer
14 years 1 months ago
Syncopation: generational real-time garbage collection in the metronome
Real-time garbage collection has been shown to be feasible, but for programs with high allocation rates, the utilization achievable is not sufficient for some systems. Since a hi...
David F. Bacon, Perry Cheng, David Grove, Martin T...
PPOPP
2011
ACM
12 years 10 months ago
GRace: a low-overhead mechanism for detecting data races in GPU programs
In recent years, GPUs have emerged as an extremely cost-effective means for achieving high performance. Many application developers, including those with no prior parallel program...
Mai Zheng, Vignesh T. Ravi, Feng Qin, Gagan Agrawa...
CDC
2008
IEEE
131views Control Systems» more  CDC 2008»
14 years 2 months ago
Explicit model predictive control for linear parameter-varying systems
Abstract— In this paper we demonstrate how one can reformulate the MPC problem for LPV systems to a series of mpLPs by a closed-loop minimax MPC algorithm based on dynamic progra...
Thomas Besselmann, Johan Löfberg, Manfred Mor...