Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
This paper deals with the problem of finding sign occurrences in a sign language (SL) video. It begins with an analysis of sign models and the way they can take into account the s...
In the automotive domain, several loosely-coupled Architecture Description Languages (ADLs) compete to proet of abstract modeling and analysis services on top of the implementatio...
KLAIM is an experimental language designed for modeling and programming distributed systems composed of mobile components where distribution awareness and dynamic system architect...
Today’s Application Specific Instruction-set Processor (ASIP) design methodology often employs centralized Architecture Description Language (ADL) processor models, from which s...
Jianjiang Ceng, Weihua Sheng, Manuel Hohenauer, Ra...