Analysis of network traffic indicates that packet arrival processes have significant stochastic dependence. It has been suggested that this dependence is so strong as to be wellmo...
Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
We describe the application of simulation analysis to a complex operational problem involving scheduling, sequencing, and material-handling decisions. The manufacturing process un...
We develop a simulation model for the ATM ABR service, and use it to engineer ABR congestion control behavior. Although significant work has been performed on ABR rate allocation a...
Sonia Fahmy, Raj Jain, Rohit Goyal and Bobby Vanda...
We introduce a new approach, called Relative Start and Idle Time (RSIT), to solve probabilistic scheduling problems of construction repetitive projects. RSIT is a process of deter...
Chachrist Srisuwanrat, Photios G. Ioannou, Omer Ts...