We present a case study in confronting the GPT generalpurpose planner with the challenging power supply restoration (PSR) benchmark for contingent planning. PSR is derived from a ...
Earthwork projects involve moving specific amounts of earth from a discrete set of source locations to a discrete set of destinations. Constructors use different methods and equip...
Model checking of temporal logic has already been proposed for automatic planning. In this paper, we introduce a simple adaptation of the ATL model checking algorithm that returns ...
We describe a real-time, component-based system for an inspection application. We chose the inspection application and the accompanying task (or scenario) so that we might fully e...