The advanced electric power grid is a cyber-physical system comprised of physical components such as transmission lines and generators and a network of embedded systems deployed fo...
A proactive handling of faults requires that the risk of upcoming failures is continuously assessed. One of the promising approaches is online failure prediction, which means that...
Abstract-- Recovery of traffic in connectionless pure IP networks has traditionally been handled by a full re-convergence of the network state. This process operates in a time scal...
Audun Fosselie Hansen, Olav Lysne, Tarik Cicic, St...
Abstract—The development of the transformer insulation failure undergoes three stages: insulation aging, incipient faults and a short circuit. This paper presents a complete sche...
Abstract--The development of the transformer insulation failure undergoes three stages: insulation aging, incipient faults and a short circuit. This paper presents a complete schem...