Hierarchical production planning provides a formal bridge between long-term plans and short-term schedules. A hybrid simulation-based production planning architecture consisting o...
Jayendran Venkateswaran, Young-Jun Son, Albert Jon...
This paper presents a new QoS guarantee scheme called R-(m,k)-firm (Relaxed-(m,k)-firm) which provides the guarantee on transmission delay of at least m out of any k consecutive p...
— We present a refined, second-generation design, construction and integration, of a compact hyper-redundant snakelike robot, called “Woodstock.” This robot has substantial a...
H. Ben Brown, Michael Schwerin, Elie A. Shammas, H...
Building a system at the architectural level can be thought of as decomposition into components followed by a series of exercises in matching. Components must be composed with eac...
Rick Kazman, Paul C. Clements, Leonard J. Bass, Gr...
There are many kinds of control networks which have been used in various non-IP network areas, such as BA (Building Automation), FA (Factory Automation) and PA (Process Automation...