Abstract. We propose a hybrid approach for solving the resource-constrained project scheduling problem which is an extremely hard to solve combinatorial optimization problem of pra...
In the construction industry, a specialist subcontractor manages a taskforce of single-skilled laborers to work on multiple construction sites, aiming to minimize the total cost a...
This paper presents a feasibility study of evolutionary scheduling for gas pipeline operations. The problem is complex because of several constraints that must be taken into consi...
Abstract In multiuser MIMO systems, the base station schedules transmissions to a group of users simultaneously. Since the data transmitted to each user are different, in order to ...
Most classical scheduling formulations assume a fixed and known duration for each activity. In this paper, we weaken this assumption, requiring instead that each duration can be ...