Sciweavers

460 search results - page 88 / 92
» RTL-Datapath Verification using Integer Linear Programming
Sort
View
COR
2007
80views more  COR 2007»
13 years 6 months ago
Scheduling with tool changes to minimize total completion time under controllable machining conditions
Scheduling under controllable machining conditions has been studied for some time. Scheduling with tool changes, particularly due to tool wear, has just begun to receive attention...
M. Selim Akturk, Jay B. Ghosh, Rabia K. Kayan
PATMOS
2007
Springer
14 years 25 days ago
Optimization for Real-Time Systems with Non-convex Power Versus Speed Models
Abstract. Until now, the great majority of research in low-power systems has assumed a convex power model. However, recently, due to the confluence of emerging technological and ar...
Ani Nahapetian, Foad Dabiri, Miodrag Potkonjak, Ma...
BROADNETS
2005
IEEE
14 years 10 days ago
Dual-link failure resiliency through backup link mutual exclusion
— Networks employ link protection to achieve fast recovery from link failures. While the first link failure can be protected using link protection, there are several alternative...
Amit Chandak, Srinivasan Ramasubramanian
HIPEAC
2009
Springer
14 years 1 months ago
Adapting Application Mapping to Systematic Within-Die Process Variations on Chip Multiprocessors
Process variations, which lead to timing and power variations across identically-designed components, have been identified as one of the key future design challenges by the semico...
Yang Ding, Mahmut T. Kandemir, Mary Jane Irwin, Pa...
ICSE
2009
IEEE-ACM
14 years 1 months ago
MINTS: A general framework and tool for supporting test-suite minimization
Regression test suites tend to grow over time as new test cases are added to exercise new functionality or to target newly-discovered faults. When test suites become too large, th...
Hwa-You Hsu, Alessandro Orso