Sciweavers

188 search results - page 12 / 38
» Regret Minimization and Job Scheduling
Sort
View
DISOPT
2008
89views more  DISOPT 2008»
13 years 7 months ago
Group sequencing around a common due date
The problem of scheduling groups of jobs on a single machine under the group technology assumption is studied. Jobs of the same group are processed contiguously and a sequence ind...
T. C. Edwin Cheng, Mikhail Y. Kovalyov, C. T. Ng, ...
DAGSTUHL
2007
13 years 9 months ago
Equilibria for two parallel links: The strong price of anarchy versus the price of anarchy
Following recent interest in the strong price of anarchy (SPOA), we consider this measure, as well as the well known price of anarchy (POA) for the job scheduling problem on two u...
Leah Epstein
COCOON
2009
Springer
13 years 5 months ago
An FPTAS for the Minimum Total Weighted Tardiness Problem with a Fixed Number of Distinct Due Dates
Given a sequencing of jobs on a single machine, each one with a weight, processing time, and a due date, the tardiness of a job is the time needed for its completion beyond its du...
George Karakostas, Stavros G. Kolliopoulos, Jing W...
IFIPTCS
2010
13 years 5 months ago
Approximating the Non-contiguous Multiple Organization Packing Problem
We present in this paper a 5/2-approximation algorithm for scheduling rigid jobs on multi-organizations. For a given set of n jobs, the goal is to construct a schedule for N organi...
Marin Bougeret, Pierre-François Dutot, Klau...
COR
2010
127views more  COR 2010»
13 years 7 months ago
Discrepancy search for the flexible job shop scheduling problem
The Flexible Job Shop scheduling Problem (FJSP) is a generalization of the classical Job Shop Problem in which each operation must be processed on a given machine chosen among a f...
Abir Ben Hmida, Mohamed Haouari, Marie-José...