Sciweavers

188 search results - page 29 / 38
» Regret Minimization and Job Scheduling
Sort
View
IANDC
2008
80views more  IANDC 2008»
13 years 7 months ago
Preemptive scheduling on a small number of hierarchical machines
We consider preemptive offline and online scheduling on identical machines and uniformly related machines in the hierarchical model, with the goal of minimizing the makespan. In t...
György Dósa, Leah Epstein
MTA
2002
110views more  MTA 2002»
13 years 7 months ago
Fundamentals of Scheduling and Performance of Video Tape Libraries
Robotic tape libraries are popular for applications with very high storage requirements, such as video servers. Here, we study the throughput of a tape library system, we design a...
Costas Georgiadis, Peter Triantafillou, Christos F...
ANOR
2008
171views more  ANOR 2008»
13 years 7 months ago
A branch and bound method for the job-shop problem with sequence-dependent setup times
This paper deals with the job-shop scheduling problem with sequencedependent setup times. We propose a new method to solve the makespan minimization problem to optimality. The met...
Christian Artigues, Dominique Feillet
LATIN
2004
Springer
14 years 1 months ago
On the Competitiveness of AIMD-TCP within a General Network
This paper presents a new mathematical model of AIMD (Additive Increase Multiplicative Decrease) TCP for general networks that we believe is better than those previously used when...
Jeff Edmonds
GCA
2009
13 years 5 months ago
A Learning Approach to Mechanism Design in Grid Resource Allocation
In this article a new algorithm for grid resource allocation based upon the theory of Algorithmic Mechanism Design (AMD) is presented. This algorithm is targeted at minimizing cost...
Mahmoud Moravej, Saeed Parsa