A single machine scheduling problem with parameters given in the form of fuzzy numbers is considered. It is assumed that the optimal schedule in such a problem cannot be determine...
—An approach for resource scheduling based on multiagent model with distributed queue is discussed. Algorithms of functioning agents for distributed Grid scheduling are presented...
Victor Korneev, Dmitry Semenov, Andrey Kiselev, Bo...
Eulerian extension problems aim at making a given (directed) (multi-)graph Eulerian by adding a minimum-cost set of edges (arcs). These problems have natural applications in schedu...
Frederic Dorn, Hannes Moser, Rolf Niedermeier, Mat...
Consider a heterogeneous cluster system, consisting of processors with varying processing capabilities and network links with varying bandwidths. Given a DAG application to be sch...