Sciweavers

88 search results - page 9 / 18
» Scheduling an Industrial Production Facility
Sort
View
ECRTS
1999
IEEE
14 years 26 days ago
Handling sporadic tasks in off-line scheduled distributed real-time systems
Many industrial applications mandate the use of a timetriggered paradigm and consequently the use of off-line scheduling for reasons such as predictability, certification, cost, o...
Damir Isovic, Gerhard Fohler
FLAIRS
2006
13 years 10 months ago
Tabu Search for a Car Sequencing Problem
The goal of this paper is to propose a tabu search heuristic for the car sequencing problem (CSP) used for the ROADEF 2005 international Challenge. This NP-hard problem was propos...
Nicolas Zufferey, Martin Studer, Edward A. Silver
EOR
2007
82views more  EOR 2007»
13 years 8 months ago
Minimizing makespan with multiple-orders-per-job in a two-machine flowshop
: New semiconductor wafer fabrication facilities use Front Opening Unified Pods (FOUPs) as a common unit of wafer transfer. Since the number of pods is limited due to high costs, a...
Jeffrey D. Laub, John W. Fowler, Ahmet B. Keha
WCE
2007
13 years 9 months ago
Optimizing Designs based on Risk Approach
— In this paper a new approach to optimize nuclear power plant designs based on global risk reduction are described. In design the focus is on as components quality as redundancy...
Jorge E. Núñez Mc Leod, Selva S. Riv...
RIDE
1998
IEEE
14 years 4 days ago
Design of Multi-user Editing Servers for Continuous Media
Based on a fifteen month investigation of a post production facilities for both the entertainment industry and broadcasters, we identified a number of challenges with the design an...
Seon Ho Kim, Shahram Ghandeharizadeh