Sciweavers

1191 search results - page 126 / 239
» Scheduling in a Multi-Agent Environment
Sort
View
ENTCS
2008
138views more  ENTCS 2008»
13 years 9 months ago
Compositionality of Statically Scheduled IP
Timing Closure in presence of long global wire interconnects is one of the main current issues in System-onChip design. One proposed solution to the Timing Closure problem is Late...
Julien Boucaron, Jean-Vivien Millo
ESWA
2008
162views more  ESWA 2008»
13 years 9 months ago
Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
The proportionate flow shop (PFS) is considered as a unique case of the flow shop problem in which the processing times of the operations belonging to the same job are equal. A pr...
Der-Fang Shiau, Shu-Chen Cheng, Yueh-Min Huang
GRID
2006
Springer
13 years 9 months ago
Simultaneous Scheduling of Replication and Computation for Data-Intensive Applications on the Grid
One of the first motivations of using grids comes from applications managing large data sets in field such as high energy physics or life sciences. To improve the global throughput...
Frederic Desprez, Antoine Vernois
DAC
2009
ACM
14 years 10 months ago
Mode grouping for more effective generalized scheduling of dynamic dataflow applications
For a number of years, dataflow concepts have provided designers of digital signal processing systems with environments capable of expressing high-level software architectures as ...
William Plishker, Nimish Sane, Shuvra S. Bhattacha...
AINA
2009
IEEE
14 years 4 months ago
Reliability-Driven Reputation Based Scheduling for Public-Resource Computing Using GA
— For an application in public-resource computing environments, providing reliable scheduling based on resource reliability evaluation is becoming increasingly important. Most ex...
Xiaofeng Wang, Chee Shin Yeo, Rajkumar Buyya, Jins...