Sciweavers

1191 search results - page 48 / 239
» Scheduling in a Multi-Agent Environment
Sort
View
PUK
2000
13 years 11 months ago
Scheduling in a Planning Environment
In a real planning problem, there exists a set of constraints (both temporal constraints and resource usage constraints) which must be satisfied in order to obtain a feasible plan....
Antonio Garrido Tejero, Miguel A. Salido, Federico...
JNW
2008
106views more  JNW 2008»
13 years 10 months ago
Optimization of Job Schedule Model Based on Grid Environment
CPU utilization, throughput, turnaround time, waiting time, and response time are the factor to influence system performance. Every system uses different scheduling algorithms to a...
Homer Wu, Chong-Yen Lee, Wuu-Yee Chen, Tsang-Yean ...
AIIA
2001
Springer
14 years 2 months ago
A Constraint-Based Architecture for Flexible Support to Activity Scheduling
Abstract. The O-OSCAR software architecture is a problem solving environment for complex scheduling problem that is based on a constraintbased representation. On top of this core r...
Amedeo Cesta, Gabriella Cortellessa, Angelo Oddi, ...
AIR
2005
130views more  AIR 2005»
13 years 10 months ago
Framework for Task Scheduling in Heterogeneous Distributed Computing Using Genetic Algorithms
An algorithm has been developed to dynamically schedule heterogeneous tasks on heterogeneous processors in a distributed system. The scheduler operates in an environment with dynam...
Andrew J. Page, Thomas J. Naughton
NPC
2005
Springer
14 years 3 months ago
A Performance-Based Parallel Loop Self-scheduling on Grid Computing Environments
Efficient loop scheduling on parallel and distributed systems depends mostly on load balancing, especially on heterogeneous PC-based cluster and grid computing environments. In thi...
Wen-Chung Shih, Chao-Tung Yang, Shian-Shyong Tseng