A system based on a hierarchical scheduler is a system in which the processor is shared between several collaborative schedulers. Such schedulers exist since 1960 and they are bec...
In this paper we develop a two stage algorithm for scheduling call centers with strict SLAs and arrival rate uncertainty. The first cut schedule can be developed in less than a mi...
The objective of multi-site scheduling is to support the scheduling activities of a global scheduler and schedulers in distributed production plants in a cooperative way. A global...
An integrated optimization model of production plan and scheduling is introduced. Function objective is to minimize sum of total setup cost (initial setup cost and related setup c...
Abstract. Quantitative model checking computes the probability values of a given property quantifying over all possible schedulers. It turns out that maximum and minimum probabilit...