Sciweavers

904 search results - page 27 / 181
» Scheduling task graphs optimally with A
Sort
View
PC
2000
93views Management» more  PC 2000»
13 years 8 months ago
Scheduling outtrees of height one in the LogP model
The LogP model is a model of parallel computation that characterises a parallel computer system by four parameters: the latency L, the overhead o, the gap g and the number of proc...
Jacques Verriet
CCGRID
2008
IEEE
14 years 3 months ago
Joint Communication and Computation Task Scheduling in Grids
In this paper we present a multicost algorithm for the joint time scheduling of the communication and computation resources that will be used by a task. The proposed algorithm sel...
Kostas Christodoulopoulos, Nikolaos D. Doulamis, E...
AIPS
2007
13 years 11 months ago
Managing Personal Tasks with Time Constraints and Preferences
This paper treats the problem of managing personal tasks, through an adaptation of the Squeaky Wheel Optimization (SWO) framework, enhanced with powerful heuristics and full const...
Ioannis Refanidis
CLUSTER
2006
IEEE
14 years 2 months ago
Robust task scheduling in non-deterministic heterogeneous computing systems
The paper addresses the problem of matching and scheduling of DAG-structured application to both minimize the makespan and maximize the robustness in a heterogeneous computing sys...
Zhiao Shi, Emmanuel Jeannot, Jack Dongarra
CAAN
2006
Springer
14 years 12 days ago
Scheduling of a Smart Antenna: Capacitated Coloring of Unit Circular-Arc Graphs
We consider scheduling problems that are motivated by an optimization of the transmission schedule of a smart antenna. In these problems we are given a set of messages and a confl...
Guy Even, Shimon Shahar