Sciweavers

1719 search results - page 214 / 344
» Scheduling with soft constraints
Sort
View
RTSS
2000
IEEE
14 years 2 months ago
An Incremental Approach to Scheduling during Overloads in Real-Time Systems
In this paper we propose a novel scheduling framework for a real-timeenvironmentthat experiences dynamic changes. Thisframework is capable of adjusting the system workload in incr...
Pedro Mejía-Alvarez, Rami G. Melhem, Daniel...
ICMCS
1999
IEEE
130views Multimedia» more  ICMCS 1999»
14 years 2 months ago
Dynamic Window-Constrained Scheduling for Multimedia Applications
This paper describes an algorithm, called Dynamic Window-Constrained Scheduling (DWCS), designed to meet the service constraints on packets from multiple, network-bound media stre...
Richard West, Karsten Schwan
WSC
2007
14 years 12 days ago
Hierarchical planning and multi-level scheduling for simulation-based probabilistic risk assessment
Simulation of dynamic complex systems—specifically, those comprised of large numbers of components with stochastic behaviors—for the purpose of probabilistic risk assessment f...
Hamed Nejad, Dongfeng Zhu, Ali Mosleh
WSC
2008
14 years 12 days ago
Simulation-based, optimized scheduling of limited bar-benders over multiple building sites
In the construction industry, a specialist subcontractor manages a taskforce of single-skilled laborers to work on multiple construction sites, aiming to minimize the total cost a...
Hoi-Ching Lam, Ming Lu
ESA
2010
Springer
162views Algorithms» more  ESA 2010»
13 years 10 months ago
Solving an Avionics Real-Time Scheduling Problem by Advanced IP-Methods
We report on the solution of a real-time scheduling problem that arises in the design of software-based operation control of aircraft. A set of tasks has to be distributed on a min...
Friedrich Eisenbrand, Karthikeyan Kesavan, Raju S....