Sciweavers

266 search results - page 13 / 54
» Solving Very Large Crew Scheduling Problems to Optimality
Sort
View
ICC
2007
IEEE
14 years 5 months ago
A Cost-Effective Approach to Optical Packet/burst Scheduling
Abstract— Optical Burst and Packet Switching are being considered as the most promising paradigms to increase bandwidth efficiency in IP over DWDM networks. In both cases, due t...
Franco Callegati, Aldo Campi, Walter Cerroni
CPAIOR
2010
Springer
14 years 3 months ago
A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling
Abstract. We propose a hybrid approach for solving the resource-constrained project scheduling problem which is an extremely hard to solve combinatorial optimization problem of pra...
Timo Berthold, Stefan Heinz, Marco E. Lübbeck...
HICSS
2002
IEEE
135views Biometrics» more  HICSS 2002»
14 years 3 months ago
Integrated Production Planning and Route Scheduling in Pulp Mill Industry
In this paper we consider the complete supply chain for a large pulp producer in Sweden. The supply chain is divided up in two parts, the pulp production planning problem and the ...
David Bredström, Mikael Rönnqvist
COR
2011
13 years 5 months ago
Event-based MILP models for resource-constrained project scheduling problems
In this paper we make a comparative study of several mixed integer linear programming (MILP) formulations for resource-constrained project scheduling problems (RCPSPs). First, we ...
Oumar Koné, Christian Artigues, Pierre Lope...
TEC
2002
152views more  TEC 2002»
13 years 10 months ago
Ant colony optimization for resource-constrained project scheduling
An ant colony optimization (ACO) approach for the resource-constrained project scheduling problem (RCPSP) is presented. Several new features that are interesting for ACO in general...
Daniel Merkle, Martin Middendorf, Hartmut Schmeck