Sciweavers

17 search results - page 3 / 4
» Solving the Sports League Scheduling Problem with Tabu Searc...
Sort
View
HEURISTICS
2010
13 years 2 months ago
An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport
Operation management of underground passenger transport systems is associated with combinatorial optimization problems (known as crew and train scheduling and rostering) which bel...
Rafael Elizondo, Víctor Parada, Lorena Prad...
ESWA
2008
162views more  ESWA 2008»
13 years 7 months ago
Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
The proportionate flow shop (PFS) is considered as a unique case of the flow shop problem in which the processing times of the operations belonging to the same job are equal. A pr...
Der-Fang Shiau, Shu-Chen Cheng, Yueh-Min Huang
SAT
2004
Springer
73views Hardware» more  SAT 2004»
14 years 25 days ago
A SAT Based Scheduler for Tournament Schedules
We present a scheduler with a web interface for generating fair game schedules of a tournament. The tournament can be either single or double round-robin or something in between. T...
Hantao Zhang, Dapeng Li, Haiou Shen
ATAL
2010
Springer
13 years 8 months ago
Finding approximate competitive equilibria: efficient and fair course allocation
In the course allocation problem, a university administrator seeks to efficiently and fairly allocate schedules of over-demanded courses to students with heterogeneous preferences...
Abraham Othman, Tuomas Sandholm, Eric Budish
TEC
2002
152views more  TEC 2002»
13 years 7 months ago
Ant colony optimization for resource-constrained project scheduling
An ant colony optimization (ACO) approach for the resource-constrained project scheduling problem (RCPSP) is presented. Several new features that are interesting for ACO in general...
Daniel Merkle, Martin Middendorf, Hartmut Schmeck