Drawing on a fieldwork study, this paper considers different design options for the development of a system for facilitating distributed organisation and distributed working withi...
: Virtual-build-to-order (VBTO) is a form of order fulfilment system in which the producer has the ability to search across the entire pipeline of finished stock, products in produ...
Let p be a prime and let G be the 3-fold direct product of the cyclic group of order p. R´edei conjectured if G is the direct product of subsets A and B, each of which contains th...