Sciweavers

317 search results - page 28 / 64
» Time-constrained project scheduling
Sort
View
WSC
2004
13 years 9 months ago
On Using Monte Carlo Methods for Scheduling
Monte Carlo techniques have long been used (since Buffon's experiment to approximate the value of by tossing a needle onto striped paper) to analyze phenomena which, due to ...
Samarn Chantaravarapan, Ali K. Gunal, Edward J. Wi...
CCGRID
2005
IEEE
14 years 1 months ago
A batch scheduler with high level components
In this article we present the design choices and the evaluation of a batch scheduler for large clusters, named OAR. This batch scheduler is based upon an original design that emp...
Nicolas Capit, Georges Da Costa, Yiannis Georgiou,...
IPPS
2005
IEEE
14 years 1 months ago
Production Scheduling by Reachability Analysis - A Case Study
— Schedule synthesis based on reachability analysis of timed automata has received attention in the last few years. The main strength of this approach is that the expressiveness ...
Gerd Behrmann, Ed Brinksma, Martijn Hendriks, Ange...
ESANN
2003
13 years 9 months ago
Improving iterative repair strategies for scheduling with the SVM
The resource constraint project scheduling problem (RCPSP) is an NP-hard benchmark problem in scheduling which takes into account the limitation of resources’ availabilities in ...
Kai Gersmann, Barbara Hammer
NETWORKING
2004
13 years 9 months ago
Distributed Scheduling of Recording Tasks with Interconnected Servers
We consider a system with multiple interconnected video servers storing TV programs that are received through satellite antennas. Users, equipped with set-top boxes, submit request...
Sergios Soursos, George D. Stamoulis, Theodoros Bo...