Sciweavers

317 search results - page 41 / 64
» Time-constrained project scheduling
Sort
View
HICSS
2002
IEEE
80views Biometrics» more  HICSS 2002»
14 years 20 days ago
EasyWinWin: Managing Complexity in Requirements Negotiation with GSS
More than ¾ of large software projects suffer large cost and schedule overruns or fail outright. Deficits in project requirements cause more than half of these failures and overr...
Robert O. Briggs, Paul Grünbacher
DGO
2008
135views Education» more  DGO 2008»
13 years 9 months ago
Florida Public Hurricane Loss Model (FPHLM): research experience in system integration
The Florida Public Hurricane Loss Model (FPHLM) developed in the State of Florida offers an open, public and effective tool for the government to regulate the insurance ratemaking...
Shu-Ching Chen, Min Chen, Na Zhao, Shahid Hamid, K...
ASAP
1997
IEEE
107views Hardware» more  ASAP 1997»
13 years 11 months ago
Tiling with limited resources
In the framework of perfect loop nests with uniform dependences, tiling has been extensively studied as a source-to-source program transformation. Little work has been devoted to ...
Pierre-Yves Calland, Jack Dongarra, Yves Robert
CP
2009
Springer
14 years 2 months ago
Why Cumulative Decomposition Is Not as Bad as It Sounds
Abstract. The global cumulative constraint was proposed for modelling cumulative resources in scheduling problems for finite domain (FD) propagation. Since that time a great deal ...
Andreas Schutt, Thibaut Feydy, Peter J. Stuckey, M...
IPPS
2006
IEEE
14 years 1 months ago
WaveGrid: a scalable fast-turnaround heterogeneous peer-based desktop grid system
We propose a novel heterogeneous scalable desktop grid system, WaveGrid, which uses a peer-to-peer architecture and can satisfy the needs of applications with fastturnaround requi...
Dayi Zhou, Virginia Mary Lo