Scheduling of a construction project requires: a) hierarchical decomposition of the project; b) incorporation of risk and uncertainty in the activity time and cost estimates; and ...
In dynamic scenes with occluding objects many features need to be tracked for a robust real-time camera pose estimation. An open problem is that tracking too many features has a ne...
This paper describes an approach for incorporating externally specified aggregate ratings information into certain types of collaborative filtering (CF) methods. For a statistic...
Learning probabilistic graphical models from high-dimensional datasets is a computationally challenging task. In many interesting applications, the domain dimensionality is such a...
This paper describes the methodology used to add nonintrusive system-level fault tolerance to an electronic throttle controller. The original model of the throttle controller is a...