Sciweavers

2212 search results - page 37 / 443
» Weighted control scheduling
Sort
View
NETWORKING
2007
13 years 9 months ago
Characterizing the Capacity Gain of Stream Control Scheduling in MIMO Wireless Mesh Networks
Stream control has recently attracted attentions in the research of MIMO wireless networks as a potential way to improve network capacity. However, inappropriate use of stream cont...
Yue Wang, Dah-Ming Chiu, John C. S. Lui
ENTCS
2002
88views more  ENTCS 2002»
13 years 7 months ago
Testing Concurrent Java Programs using Randomized Scheduling
The difficulty of finding errors caused by unexpected interleavings of threads in concurrent programs is well known. Model checkers can pinpoint such errors and verify correctness...
Scott D. Stoller
RTSS
2002
IEEE
14 years 17 days ago
Improving Quality-of-Control Using Flexible Timing Constraints: Metric and Scheduling Issues
Closed-loop control systems are dynamic systems subject to perturbations. One of the main concerns of the control is to design controllers to correct or limit the deviation that t...
Pau Martí, Josep M. Fuertes, Gerhard Fohler...
RTAS
2002
IEEE
14 years 17 days ago
Feedback Scheduling of Model Predictive Controllers
The paper presents some preliminary results on dynamic scheduling of model predictive controllers (MPCs). In an MPC, the control signal is obtained by on-line optimization of a co...
Dan Henriksson, Anton Cervin, Johan Åkesson,...
HPDC
2008
IEEE
13 years 7 months ago
A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale grids
This paper describes the study conducted to design and evaluate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on large...
Marco Pasquali, Ranieri Baraglia, Gabriele Capanni...