Sciweavers

172 search results - page 32 / 35
» eor 2006
Sort
View
EOR
2007
69views more  EOR 2007»
13 years 10 months ago
The value of early order commitment in a two-level supply chain
One approach to supply chain coordination is early order commitment, whereby a retailer commits to purchase a fixedorder quantity at a fixed delivery time before demand uncertai...
Xiande Zhao, Jinxing Xie, Jerry C. Wei
EOR
2007
85views more  EOR 2007»
13 years 10 months ago
Machine reliability and preventive maintenance planning for cellular manufacturing systems
The paper proposes a preventive maintenance (PM) planning model for the performance improvement of cellular manufacturing systems (CMS) in terms of machine reliability, and resour...
K. Das, R. S. Lashkari, S. Sengupta
EOR
2007
117views more  EOR 2007»
13 years 10 months ago
Considering manufacturing cost and scheduling performance on a CNC turning machine
A well known industry application that allows controllable processing times is the manufacturing operations on CNC machines. For each turning operation as an example, there is a n...
Sinan Gurel, M. Selim Akturk
EOR
2007
79views more  EOR 2007»
13 years 10 months ago
The directional p
An instance of a p-median problem gives n demand points. The objective is to locate p supply points in order to minimize the total distance of the demand points to their nearest s...
Laura E. Jackson, George N. Rouskas, Matthias F. M...
EOR
2007
90views more  EOR 2007»
13 years 10 months ago
Accelerating column generation for variable sized bin-packing problems
In this paper, we study different strategies to stabilize and accelerate the column generation method, when it is applied specifically to the variable sized bin-packing problem,...
Cláudio Alves, José M. Valéri...