The problem of scheduling the production of new and recoverable defective items of the same product manufactured on the same facility is studied. Items are processed in batches. E...
M. S. Barketau, T. C. Edwin Cheng, Mikhail Y. Kova...
In this paper we study an assemble-to-order environment involving a short-life-cycle product. The product is sold in two different configurations, each requiring a unique componen...
Abstract. Many hospitals in the Netherlands are confronted with capacity problems at their Intensive Care Units (ICUs) resulting in cancelling operations, overloading the staff wit...
Nelly Litvak, Marleen van Rijsbergen, Richard J. B...
We consider the robust surgery loading problem for a hospital's operating theatre department, which concerns assigning surgeries and sufficient planned slack to operating roo...
Erwin W. Hans, Gerhard Wullink, Mark van Houdenhov...
Primal-dual Interior-Point Methods (IPMs) have shown their ability in solving large classes of optimization problems efficiently. Feasible IPMs require a strictly feasible startin...