Sciweavers

1077 search results - page 128 / 216
» integration 2000
Sort
View
WSC
2000
13 years 9 months ago
Simulation as educational support for production and logistics in industrial engineering
The proposed implementation is a monitor system able to train operators for on-line real time manufacturing control in order to analyze the performance of a production process. Th...
Agostino G. Bruzzone, Pietro Giribone, Roberto Rev...
CORR
2010
Springer
98views Education» more  CORR 2010»
13 years 8 months ago
A Fast Approach to Creative Telescoping
Abstract. In this note we reinvestigate the task of computing creative telescoping relations in differential-difference operator algebras. Our approach is based on an ansatz that e...
Christoph Koutschan
AIEDAM
2000
98views more  AIEDAM 2000»
13 years 8 months ago
Generating and evaluating designs and plans for microwave modules
This paper describes the process planning techniques we developed for use in an Integrated Product and Process Design (IPPD) tool for the design and manufacture of microwave trans...
Dana S. Nau, Michael O. Ball, John S. Baras, Abdur...
AIR
2000
91views more  AIR 2000»
13 years 8 months ago
PlanMine: Predicting Plan Failures Using Sequence Mining
This paper presents the PLANMINE sequence mining algorithm to extract patterns of events that predict failures in databases of plan executions. New techniques were needed because p...
Mohammed Javeed Zaki, Neal Lesh, Mitsunori Ogihara
APIN
2000
124views more  APIN 2000»
13 years 8 months ago
Exception Handling in Workflow Systems
Abstract. In this paper, defeasible workflow is proposed as a framework to support exception handling for workflow management. By using the "justified" ECA rules to captu...
Zongwei Luo, Amit P. Sheth, Krys Kochut, John A. M...