Sciweavers

1380 search results - page 204 / 276
» scheduling 2008
Sort
View
AIMSA
2008
Springer
15 years 9 months ago
Nested Precedence Networks with Alternatives: Recognition, Tractability, and Models
Integrated modeling of temporal and logical constraints is important for solving real-life planning and scheduling problems. Logical constrains extend the temporal formalism by rea...
Roman Barták, Ondrej Cepek
133
Voted
AAAI
2008
15 years 5 months ago
Planning with Problems Requiring Temporal Coordination
We present the first planner capable of reasoning with both the full semantics of PDDL2.1 (level 3) temporal planning and with numeric resources. Our planner, CRIKEY3, employs heu...
Andrew Coles, Maria Fox, Derek Long, Amanda Smith
128
Voted
FLAIRS
2008
15 years 5 months ago
A Framework for Merging Qualitative Constraints Networks
Spatial or temporal reasoning is an important task for many applications in Artificial Intelligence, such as space scheduling, navigation of robots, etc. Several qualitative appro...
Jean-François Condotta, Souhila Kaci, Nicol...
WSC
2008
15 years 5 months ago
Simulation of modular building construction
Modular construction has the advantage of producing structures quickly and efficiently, while not requiring the resources to build a structure to be co-located with the constructi...
Osama M. Mohsen, Paul J. Knytl, Basel Abdulaal, Ja...
WSC
2008
15 years 5 months ago
A framework for real-time simulation of heavy construction operations
This paper describes a framework of real-time simulation for modeling heavy construction operations. Compared with the traditional offline simulation that uses stationary inputs, ...
Lingguang Song, Fernando Ramos, Katie Arnold